Hi,
Swiss International Air Lines is in talks with Embraer to delay deliveries of 60 EMB-170's as it cuts costs and adjusts to a slump in seat demand. Swiss wants to extend the timetable for delivery of 30 Embraer-170's and 30 Embraer-195's to between 2008 and 2010. Normally, these aircraft should be delivered before 2006.
Thanks
jmc_757-200
Swiss International Air Lines is in talks with Embraer to delay deliveries of 60 EMB-170's as it cuts costs and adjusts to a slump in seat demand. Swiss wants to extend the timetable for delivery of 30 Embraer-170's and 30 Embraer-195's to between 2008 and 2010. Normally, these aircraft should be delivered before 2006.
Thanks
jmc_757-200