Originally posted by Evan
View Post
Sorry for misleading you. I do know about the issue of the G+Y hydro systems failing in cascade, the PTU, the PTU logic change, and the OEB + ECAM's OEB reminder for when such change is not in place. I got the MOD 34236 + 35879 / SB 29-1115 and MOD 35938 / SB 29-1126 stuff from somewhere after all, didn't I? (and it was not from my butt but from an issue of Airbus's Safety First magazine).
When I said "that almost looks like communication" I wasn't being sarcastic (or perhaps I was, in a different way). I meant that you and ATL were communicating in a way very much unlike what we saw in the pitot tube thread, a way that really resembles communication.
Leave a comment: